Munters
Reducing energy consumption on the SSGB
SS Great Britain Case study
SS Great Britain were looking at ways they could reduce their energy footprint. They identified the heating of air in the dry dock to be a key factor and hired Munters to help update the heating fans.
We were commissioned by Munters to produce a case study about the pioneering upgrade and were on-site filming at every step of the two day installation.